|
|
| |
|
|
| |
| what is: |
Three Mine-
Hunters for the Finnish Navy |
| where is: |
Sarzana, near La Spezia,
Italy |
| contractors: |
Finnish Navy,
Intermarine |
| our tasks: |
Support to the
management of the project life cycle, by means of our software
product PTESY |
|
Setup and
customization of PTESY, interface with other systems (Configuration
Manager, Documents Management) |
|
Training of
the customer personnel for the use of the PTESY system |
|
Intermarine Patrol Boat (film library footage) |
|
| |
| what is: |
Automated Data Acquisition & Management System,
process metrics collection, for the CMMi certification. |
| where is: |
8 Galileo
Avionica sites, Italy |
| contractors: |
Galileo
Avionica (Finmeccanica), NICE |
| our tasks: |
Design,
development, startup and test of the application |
| technologies: |
Java J2EE
Servlet, EnginFrame, web service, Apache Tomcat, Hibernate, MySQL. |
|
Training of
the customer personnel for the use of the system. |
|
 A
principle view of the system interfaces. |
|
|
 |
|
|
| |
|
|
| |
| what is: |
Robotic
welding lines, for the assembly of part of the structure of the new Mercedes C
Class model 300 |
| where is: |
Sindelfingen
(Stuttgart), Bremen, East London (South Africa) |
| contractors: |
DAIMLER-CHRYSLER,
COMAU, GMI |
| our tasks: |
Development of
the software in PLC Siemens Step7 environment / Intouch Wonderware /
Integra |
|
Installation
of the software |
|
Startup of the
lines |
|
Matching the
quality requirements (cycle time and geometry) |
|
Welding
Robots in function |
|
| |
| what is: |
Robotic
welding lines, for the assembly of the structure of FIAT models |
| where is: |
Tychy |
| contractors: |
FIAT,
COMAU |
| our tasks: |
Development of
the PLC software (Allen Bradley) |
|
|
Installation
of the software |
|
|
Startup of the
lines |
|
|
Matching the
quality requirements |
|
Fiat 500, assembled in Tychy (Poland) |
|
| |
| what is: |
Fibers Carding
Plants (wool or synthetic fibers) |
| where is: |
Sonzhou (China),
Xiaoshan Hangzhou ( China), Camden (South carolina, US |
| contractors: |
OERLIKON-NEUMAG,
S. AGATA |
| our tasks: |
Startup of the
plant, PLC Siemens Step7 / WINCC |
|
|
Installation
of the software
|
|
|
Startup of
the production
|
|
|
Final tuning of the software and supervisor
|
|
Carding
plant |
|
| |
| what is: |
Dyeing Plants
(textile) |
| where is: |
Biella,
Torino, Veneto, Emilia, Milano, Italia |
| contractors: |
COTONIFICIO DUCA VISCONTI DI MODRONE, SEVERI & GAVIOLI,
REMMERT, FILATI BURATTI,
LANIFICIO BOTTO GIUSEPPE, TINTORIA DI CASELLE,
LANIFICIO ZIGNONE, FILIVIVI |
| our tasks: |
hardware &
software maintenance of the dyeing automation systems |
|
|
recovering
of electronic cards
|
|
|
full
plants revamping (eletric and automation)
|
|
|
supply of electric cabinets, including plc operator
panel
|
|
 Dyeing
tanks: in hanks, in horizontal distaff, in flock distaff vertical
tops |
|
|
|
 |
|
|
| |
|
|
| |
| what is: |
A 70-MW plasma arc heated hypersonic wind tunnel |
| where is: |
Capua, near
Napoli, Italia |
| contractors: |
LABEN,
CIRA, ESA,
Italian Research Dept. (MIUR) |
| our tasks: |
system
integration |
|
real time
dynamic simulator design and development |
|
integration
test supervision |
|
quality
management |
|
Plasma
Wind Tunnel - an aerial view |

the
Test Chamber |
|
|
 |
| |
| what is: |
Facility for
Integrated Planetary Exploration Simulation (FIPES), in team with TNO
and Space Horizon (The
Nederlands) |
| what the job is: |
reply to the
ESA ITT AO4860, for the preliminary design of the facility |
| where is: |
ESA/ESTEC
Noordwijk - The Nederlands |
| contractors: |
ESA |
| our tasks: |
automation and
process control systems design |
|
human healt
systems design |
|
human
psychology aspects design |
|
quality
management |
|
An
artistic view of the Core Isolation Habitat |
|
|
|
 |
| |
| what is: |
The flight
simulator of the Tornado aircraft, for training of the pilots |
| what the job is: |
Porting of the
Tornado flight simulator from TI ('70s) platform to DEC Alpha |
| where is: |
Ghedi, Gioia
del Colle, Italia |
| contractors: |
METEOR, OTAN |
| our tasks: |
project
coordination |
|
reverse design
and reverse engineering methodologies and tools |
|
work team
recruiting and training |
|
quality
management |
|
A
pilot sitting in the simulated cockpit |
|
|
|
 |
|
|
|
|
|
| |
| what is: |
The Safety and
Emergency Management System for the 3.3 km long Bridge over the
Strait of Messina |
| where is: |
between
Messina (Sicilia) and Reggio Calabria (Calabria), Italia |
| contractors: |
IMPREGILO, STE |
| our tasks: |
system and
plants engineering and preliminary design |
|
study of the
menaces and risks |
|
design of the
plants and systems fo traffic management in emergency conditions |
|
A
simulated view
of the bridge
The
new bridge over a satellite
picture -> |

|
|
|
|
| |
| what is: |
The Safety
System for the 10.3 km long Highway Tunnel under Gran Sasso mountain |
| where is: |
In the
Abbruzzo region, between L'Aquila and Teramo, Italia |
| contractors: |
GEMMO, STE |
| our tasks: |
engineering
and definitive design for the Safety Integrated System for Highway
Tunnel |
|
study of the
menaces and risks |
|
design of the
plants and systems for dynamic traffic management, to rule the
entrance/exit of vehicles in the INFN laboratory |
|

A
detail of the dynamic traffic control system |
|
|
|
 |
| |
| what is: |
The automation
and supervision system for a 2.5 km long road tunnel, single can,
two directions |
| where is: |
Naturno, near
Bolzano, Italia |
| contractors: |
SCHNEIDER
ELECTRIC, SOGI, ANAS |
| our tasks: |
system design
and development |
|
system
integration |
|
commissioning
and field startup |
|
|
|
The
West entrance of the tunnel |

The
Control Room, and the supervision machine |
|
|
 |
|
|
|
|
|
|
| |
|
|
 |
|
|
|

|
Systems and Tools for
Project Life Cycle Management and Process Maturity |
|

|
Real Time Process
Control Systems |
|

|
Higly safe and
reliable systems |
 |
Machines for research in muscle,
exercise and neuromotor control for astronauts in flight |
 |
Health monitoring systems, for space
and earth application |
|

|
Tunnel Automation
and Traffic Control |
|

|
Aerospace, Flight
and Ground Systems |
|
 |
Railway and Metro
Automation Systems |
|

|
Research Plants
Control Systems |
|

|
Dynamic Simulators |
|

|
Telecommunications
and Data Transport Systems |
|
|
|
 |
|
|
|

|
Monitoring and
Supervision SCADA Systems |
|

|
Relational Databases
and SQL |
|

|
C++, Java, Assembler, Visual
Basic |
|

|
Safe Remote
Supervision via Intranet/Internet |
|

|
PLC,
Microprocessors |
|

|
Field buses and LAN |
|
|
|
 |
|
|
|

|
Project Management |
|

|
Feasibility |
|

|
User and System
Requirements Definition |
|

|
Definition of the
Process Control Strategies |
|

|
Test Engineering,
System Integration |
|

|
Software Development |
|

|
SubContractors and
Suppliers management |
|

|
Quality Standard Methodologies |
|
|
|
 |
|
|
|

|
Reiterative Project
Life Cycle |
|

|
ISO 12207 |
|

|
Capability Maturity
Model (CMM) and CMMi |
|

|
ISO 9001 / VISIO 2000 |
|

|
MIL-STD-498 |
|
|
|
 |
|
|
|

|
An
essential "Project & Test Engineering Methodology" - A. Autino
(paper presented at IAF 54th Congress, Bremen 29/09 - 03/10 2003) |
|

|
The
telecontrol, supervision and automation system of the Naturno tunnel is now
operative! (Italian language)
|
|

|
Our
philosophy for the Supervision, Automation and Telecontrol of road and
highway Tunnels (Italian language) |
|
|
|
 |
|
|
|